Intercem wins order from CimMetal Group to build a cement grinding plant in Togo

Print this page

Togo: Germany’s Intercem Engineering has been awarded a contract by CimMetal Group to build a 2.5Mt/yr cement grinding plant in Lomé. The opening ceremony for the project is expected to take place soon and production is scheduled to start in early 2021. No value for the order has been disclosed.

The order includes a 1000t/hr truck unloading station, a 25,000t/hr storage facility for additives, a 1000t/hr truck loading station, two 50,000t clinker silos, four packing machines, eight truck loading stations, 10 truck scales and the corresponding laboratory equipment. The steel construction, the entire sheet metal fabrication, the subsystems, the electrical equipment, the complete engineering, the supervision of erection and commissioning are also included in the scope of supply and services. All of the equipment will be supplied by European manufacturers. All material conveyors have a capacity of 1200t/hr and are installed in a closed gallery to ensure dust-free transport. This was planned because of the location in the immediate vicinity of the port in Lomé.

Last modified on 05 February 2020

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://www.globalcement.com/news/item/10393-intercem-wins-order-from-cimmetal-group-to-build-a-cement-grinding-plant-in-togo

© 2024 Pro Global Media Ltd. All rights reserved.