HeidelbergCement resurfaces German motorway with low-alkali cement concrete

Print this page

Germany: HeidelbergCement has reported the successful resurfacing of a section of Federal Motorway 5 (BAB 5) between Karlsruhe and Frankfurt using a concrete made from low-alkali cement produced at its 1.4Mt/yr-capacity Schelklingen, Baden-Württemberg integrated cement plant. The company used over 3600t of cement to produce the 12,000m3 of concrete required for the 3.2km stretch of road. Traffic infrastructure product manager Klaus Felsch said, “The cement’s low alkali content significantly reduces the risk of an alkali-silica reaction and maximizes the durability of the concrete.”

Last modified on 15 July 2020

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://www.globalcement.com/news/item/11077-heidelbergcement-resurfaces-german-motorway-with-low-alkali-cement-concrete

© 2024 Pro Global Media Ltd. All rights reserved.