NTPC Limited dispatches first rail load of fly ash from new depot to ACC Cement’s Tikaria grinding plant

Print this page

India: State-owned energy supplier NTPC Limited has announced the shipment of 3450t of fly ash from its 3.0GW Rihand power station in Uttar Pradesh to Switzerland-based LafargeHolcim subsidiary ACC Cement’s 3.0Mt/yr Tikaria grinding plant, also in Uttar Pradesh. The Orissa Diary newspaper has reported that the shipment – the first from a new purpose-built rail depot – over 458km is part of NTPC Limited’s commitment to 100% total fly ash utilisation, up from 73% in the 2020 financial year, ended 31 March 2020. ACC supply chain head Suresh Rathi said, “This will pave the way for efficient and safe transportation of all fly ash from power plants to cement production units located at a distance in larger quantity.”

NTPC Limited generates some 60.5Mt/yr of fly ash alongside 62.9GW of power.

Last modified on 19 August 2020

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://www.globalcement.com/news/item/11229-ntpc-limited-dispatches-first-rail-load-of-fly-ash-from-new-depot-to-acc-cement-s-tikaria-grinding-plant

© 2024 Pro Global Media Ltd. All rights reserved.