Lafarge Zementwerke appoints A TEC for Mannersdorf cement plant alternative fuels Flash Dryer installation

Print this page

Austria: Loesche subsidiary A TEC has won a contract for the supply and installation of a Flash Dryer for alternative fuels (AFs) in the kiln line of Lafarge Zementwerke's 1.1Mt/yr Mannersdorf cement plant in Lower Austria. The supplier said that it will complete the project in early 2021.

The company said, “Reaching high thermal substitution rates (TSR) requires firing of alternative fuels at the kiln burner. To reach a stable sintering zone for the required clinker quality a high fuel quality (high LCV, small particle size) is needed, otherwise the clinker quality may suffer or the TSR can be limited. With the A TEC Flash Dryer various waste heat sources can be used (clinker cooler flue gas, bypass gas, preheater gas, etc.). The material is dosed to the hot gas flow in the flash dryer and transported with this gas flow, while the moisture is evaporated, to a cyclone and a subsequent filter where the fuel is separated from the gas flow and on-line fed to a kiln burner or a satellite burner. In addition to the drying the lifting effect of the gas can separate 3D impurities which contributes in a further increase of the fuel quality.”

Last modified on 25 November 2020

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://www.globalcement.com/news/item/11649-lafarge-zementwerke-appoints-a-tec-for-mannersdorf-cement-plant-alternative-fuels-flash-dryer-installation

© 2024 Pro Global Media Ltd. All rights reserved.