ISGEC Heavy Engineering to supply waste heat recovery unit for Shree Cement’s Nawalgarh plant

Print this page

India: ISGEC Heavy Engineering has received an order from Shree Cement to supply a waste heat recovery (WHR) unit for the integrated 3.8Mt/yr Nawalgarh plant in Rajasthan. The scope of work includes design, manufacture and supply of the system. The supplier says that this will be one of the world’s largest steam-based WHR units by capacity. ISGEC previously supplied two WHR units for Shree Cement’s Raipur plant.

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://www.globalcement.com/news/item/13800-isgec-heavy-engineering-to-supply-waste-heat-recovery-unit-for-shree-cement-s-nawalgarh-plant

© 2024 Pro Global Media Ltd. All rights reserved.