Gharibwal Cement commissions new solar power facility

Print this page

Pakistan: Gharibwal Cement has announced the successful installation and commissioning of a new 12.5MW solar power system at its plant in Ismailwal. The new capacity has been integrated with the producer’s existing 12MW solar infrastructure, bringing total installed solar generation capacity to 24.5MW. The company said the additional system commenced commercial operations on 16 June 2025.

Last modified on 18 June 2025

URL: https://www.globalcement.com/news/item/18885-gharibwal-cement-commissions-new-solar-power-facility

© 2025 Pro Global Media Ltd. All rights reserved.