Philippines: Lafarge Republic signed a contract with Fives FCB for a new cement grinding plant for the Teresa plant located in Rizal province. The proposed plant will add 850,000t/yr production capacity to the Teresa plant's capacity in 2015. No financial information for the contract has been released.
The contract includes raw material feeding, with clinker and pulverised coal fed through the existing circuit and other additives, such as a limestone, gypsum, fly ash, fed by truck dump. A cement grinding workshop will be fitted with one Horomill® 3800 and one TSV™ 4500 classifier, associated with a dryer-aerodecantor and a TGT™ filter (under Fives Solios licence). A Fives Pillard vertical hot gas generator (12 MW) for the pouzzolana (25% moisture) drying will also be fitted.
The plant's cement silo will have a capacity of 5000t. A new cement transport system will connect the new silo, the site's existing silos and the packing plant. The contract also includes the control and supervision system and an electrical sub-station for the new build.