A TEC to install Rocket Mill for refuse derived fuel production in Austria

Print this page

Austria: A TEC will install a Rocket Mill at a treatment plant of A.S.A. in Wiener Neustadt to produce refuse-derived fuel (RDF). The 7 – 9t/hour plant will be taken into operation in August 2016. RDF will be supplied from the plant to the cement industry with an output size of up to 15mm.

The Rocket Mill will be mainly produced at A TEC’s production site in Eberstein. It will have a 2 x 315kW drive unit and a rotor speed of c580rpm. A TEC Group focused on the optimisation and efficiency improvement of cement plants.

Last modified on 23 March 2016

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://www.globalcement.com/news/item/4739-a-tec-to-install-rocket-mill-for-refuse-derived-fuel-production-in-austria

© 2024 Pro Global Media Ltd. All rights reserved.