Bangladesh: Loesche has received an order to supply a 56.3+3 CS type vertical roller mill for the Aman Group’s Haria 2 cement plant at Narayangonj near Dhaka. The contractor for this order is the China National Heavy Machinery Corporation (CHMC). It follows a previous order by the Aman Group for a Loesche LM 56.3+3 CS mill that was supplied in 2014 for the Haria 1 line. The new mill was supplied in late 2016.
The roller mill for the Haria 2 line has a production capacity of 240t/hour for Portland and composite cement clinker with a fineness of 3200 Blaine or 175t/hour of ground-granulated blast-furnace slag (GGBFS) with a fineness of 4500 Blaine. It has a drive power of 5300kW. In addition to the mill, the scope of supply also specifies additional technical equipment for the grinding plant including a rotary feed, a two-way chute, a metal detector and a permanent magnet drum separator.