Cem’In’Eu orders 0.25Mt/yr grinding plant from Fives

Print this page

France: Cem’In’Eu has ordered a 0.25Mt/yr grinding unit from Fives for its Portes les Valence plant in Drôme. The plant has an investment of Euro24m and it is scheduled to open in the second half of 2020. The scope of supply includes raw materials loading, clinker, limestone and gypsum hoppers, a 34t/hrt CEM II A/L FCB B-mill (ball mill) operating in a closed circuit with a FCB TSV dynamic classifier. The Portes les Valence project follows the opening of Cem’In’Eu’s grinding plant at Aliénor in Tonneins in 2018.

Last modified on 26 June 2019

URL: https://www.globalcement.com/news/item/9450-cem-in-eu-orders-0-25mt-yr-grinding-plant-from-fives

© 2019 Pro Global Media Ltd. All rights reserved.