Angola: Portugal-based IPIAC has won a contract to upgrade the Cimangola plant in Luanda region to use Limestone Calcined Clay (LC3). The project will be the first in the world to convert an existing clinker production line into a clay calciner. Switzerland-based Ecosolutions conducted a study of raw materials and sustainability issues prior to the signing of the contract. The project will be coordinated and supervised by Portugal-based Techbelt. Once completed the plant will produce 0.3Mt/yr of calcined clay, which can be used to manufacture up to 1Mt/yr of LC3 cement.

IPIAC wins contract to upgrade Cimangola plant to use limestone calcined clay
URL: https://www.globalcement.com/news/item/14658-ipiac-wins-contract-to-upgrade-cimangola-plant-to-use-limestone-calcined-clay
© 2025 Pro Global Media Ltd. All rights reserved.