Solid recovered fuel plant breaks ground in the USA

Print this page

US: A waste-to-solid-fuel plant has broken ground in West Virginia. Its developers say it is the US' first resource recovery facility that employs mechanical biological treatment (MBT).

The waste-to-solid-fuel plant in Martinsburg, West Virginia, called Entsorga WV, is expected to be operational in early 2017. Entsorga WV is a joint venture between Apple Valley Waste Technologies, Entsorga USA and Chemtex International.

By utilising the HEBioT MBT system, Entsorga WV will recover biomass, plastics and other carbon based materials from the mixed municipal solid waste (MSW) stream and convert them into an alternative fuel. When processing the MSW, Entsorga WV will remove other recyclable commodities such as ferrous and non-ferrous metals. The MSW received will be converted to solid recovered (SRF), which will be used as an alternative or supplement to fossil fuels.

The plant will be able to produce about 50,000t/yr of SRF, which will be delivered to the Essroc Cement Plant and used in conjunction with coal. The companies have entered into a long-term contract for the provision and acceptance of the SRF.

The reduction of waste that will be disposed of in landfills as a result of the Entsorga facility will result in a greenhouse gas emission reduction of 28,000t/yr of carbon dioxide equivalent. There are currently more than 330 MBT plants in operation throughout Europe, processing more than 30Mt/yr of municipal solid waste.

Last modified on 13 January 2016

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://www.globalcement.com/news/item/4492-solid-recovered-fuel-plant-breaks-ground-in-the-usa

© 2024 Pro Global Media Ltd. All rights reserved.