Leilac-2 CCS project to begin in April 2020

Print this page

Europe: Australia-based Calix has announced that construction will begin on its second low emissions intensity lime and cement (Leilac) carbon capture and storage (CCS) installation at a ‘European cement plant’ on 7 April 2020. ASX ComNews has reported that collaborators on the project, which has received Euro16m under the EU’s Horizon 2020 grant scheme, are Portugal-based Cimpor, Germany-based HeidelbergCement, Germany and France-based energy companies Ingenieurbüro-Kühlerbau-Neustadt (IKN) and Engie and Belgium-based minerals and lime company Lhoist. Calix has said that the 100,000t/yr process emissions capture facility will be operational in late 2024.
The company has appointed Emma Bowring Leilac-2 project leader.

The first Leilac installation was completed at HeidelbergCement’s 1.5Mt/yr integrated Lixhe plant in Belgium’s Limburg province in mid-2019.

Last modified on 01 April 2020

URL: https://www.globalcement.com/news/item/10654-leilac-2-ccs-project-to-begin-in-april-2020

© 2025 Pro Global Media Ltd. All rights reserved.