Japan: UBE Industries plans to install a generator powered by waste heat at its cement plant in Kanda, Fukuoka Prefecture. The generator will meet about 40% of the plant's electric power consumption reducing production costs. The US$52.1m project will start providing power as early as the second half of 2015.
The Kanda plant currently produces 11% of its own electricity using a diesel generator. UBE's decision follows similar schemes at UBE's two other domestic cement plants in Japan. The company previously put off this upgrade because of a lull in domestic demand for cement. UBE is acting now because Kyushu Electric Power Co. is preparing for a rate increase in April 2013 that will impact upon production costs.