Cambridge Electric Cement commences recycled cement production

Print this page

UK: Cambridge Electric Cement (CEC) has launched the two-year trial of its Cement 2 Zero project, aimed at scaling up production of its net zero-CO2, demolition waste-based alternative cement. It aims to produce 20t of the material for use in a low-impact construction project. CEC’s method, developed at the University of Cambridge, is based on the conversion of demolition waste into a slag-forming material within a steel furnace.

Developer Julian Allwood said “By combining steel and cement recycling in a single process powered by renewable electricity, we could supplement the global supply of the basic construction materials to support the infrastructure of a zero emissions world and to enable economic development where it is most needed.”

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://www.globalcement.com/news/item/15294-cambridge-electric-cement-commences-recycled-cement-production

© 2024 Pro Global Media Ltd. All rights reserved.