
Displaying items by tag: CimMetal Group
Togo: Cimenterie de la Côte ouest-africaine’s (CimCo) new 2.5Mt/yr grinding plant in Lomé is preparing to produce its first cement in March 2022. Germany-based Intercem Engineering says that construction work has been completed on the project and that the cladding is in place. Currently, the cold commissioning is in progress. The plant will operate as a subsidiary of CimMetal Group.
CimMetal Group and Intercem Engineering near completion of 2.5Mt/yr Lomé grinding plant
22 September 2021Togo: Germany-based Intercem Engineering says that CimMetal Group’s upcoming 2.5Mt/yr Lomé grinding plant is on track for commissioning ‘at short notice’ in late 2021. The supplier has delivered a 1000tph truck unloading station, a 25,000tph storage facility for additives, a 1000tph truck loading station, two 50,000t clinker silos, four Rotopackers, eight truck loading stations, ten truck scales and laboratory equipment, alongside steel construction, sheet metal fabrication, subsystems, electrical equipment and complete engineering services.It is also supervising the erection and commissioning of the plant. It said that all material conveyor belts are mounted in a closed gallery to ensure dust-free transport. The belt system is also designed for fully automatic ship unloading.
The plant is the third delivered for CimMetal Group by InterCem Engineering and partners InterCem Installation and Switzerland-based InterCem Cement, after one in Burkino Faso and one in Ivory Coast.