Displaying items by tag: lines
UltraTech Cement expands with Gebr. Pfeiffer technology
16 April 2024India: UltraTech Cement will integrate vertical mill technology from Gebr. Pfeiffer for three new clinker production lines. Gebr. Pfeiffer SE and its Indian subsidiary, Gebr. Pfeiffer India, will fulfil a subsequent order.
At the Happy 3 plant, cement raw material grinding will be conducted using an MVR 5000 R-4 mill, equipped with a 5300kW drive, capable of grinding about 705t/hr to a product fineness of 1.5% R 212µm. Additionally, three MPS 3550 BK mills, each with a 1300kW gearbox, will grind about 45t/hr of petcoke or 90t/hr of coal. These mills come with an integrated SLS 3750 BK classifier.
Gebr. Pfeiffer's MVR mills are distinct in their use of rollers according to the R=C principle. This design allows the same rollers to be used with parts for both raw meal and cement grinding. The MVR 5000 R-4 mill at Happy 3 features four actively redundant rollers, maintaining about 70% production capacity during maintenance. Gebr. Pfeiffer equips MVR mills with maintenance-oriented condition monitoring systems, enabling the implementation of digital maintenance strategies.
Handling of the order will be a collaborative effort between Gebr. Pfeiffer SE and Gebr. Pfeiffer India with all customer support and plant planning managed by Pfeiffer engineers in Noida. Core components like gearboxes, grinding bowls and roller suspensions will be shipped from Europe, while other parts like foundations and classifiers will be provided by the Indian subsidiary. Support for the plants will be managed by the customer support centre in Noida, accessible via remote data or on-site personnel.
Wonder Cement ignites Chittorgarh cement plant's fourth kiln
21 November 2022India: Wonder Cement has completed a successful kiln ignition in its Chittorgarh cement plant's new Line 4. The three pre-existing lines gave the plant a former capacity of 8Mt/yr. Wonder Cement additionally operates grinding plants in Haryana, Madhya Pradesh and Maharashtra, with a total capacity of 5Mt/yr.
Vice chair Vimal Patni's technical assistant Lokesh Lohar congratulated the entire Chittorgarh cement plant team on its work on the latest expansion.
Saudi Arabia: Southern Province Cement has completed technical studies and commenced construction of a new 5000t/day line at its Jazan cement plant. The company will also build the infrastructure for another 5000t/day line at the site. Reuters new has reported that, together, the lines will replace the plant’s existing production lines.
Oman Cement to upgrade Rusayl cement plant
14 September 2021Oman: Oman Cement plans to upgrade its 4.2Mt/yr Rusayl cement plant. Reuters News has reported that the producers’ plans consist of a 25% capacity expansion of Line 3 of the plant to 5000t/day from 4000t/day and the construction of a new 10,000t/day Line 4. Lines 1 and 2 will subsequently shut down. Thus, the upgrade will increase the plant’s nominal clinker capacity to 15,000t/day from 8700t/day.
Siguaney cement plant re-enters production
26 November 2019Cuba: Following 18 months of reduced operations in which time maintenance and repairs on its grey cement kilns were carried out, Corporacion Cementos Cubanos’ 0.7Mt/yr Siguaney plant is once more fully operational across its four wet lines. Esmerk has reported that the company hopes to re-open its white cement kiln at the nearest possible date.