
Displaying items by tag: Heavy Fuel Oil
South Korea/Thailand: Austria’s Unitherm Cemcon has commissioned a MAS kiln burner at a cement plant in South Korea. The order was issued in late 2018 for three MAS burners. The first burner was delivered in February 2019 and the other two in March 2019. In May 2019 Unitherm Cemcon says it supported the commissioning of the first burner.
The scope of supply included two 43MW MAS/4/KO SO type burners for coal and heavy oil and one 87MW MAS/7/KO SO.X type rotary kiln burner for coal, heavy oil and solid secondary fuels. All three burners have been executed with a divisible burner jacket tube. One MAS/7/KO.SO.X is already successfully operating in another line, firing up to 6t/hr of coal and around 10t/hr of solid secondary fuel.
The burner manufacturer has also been awarded a contract to supply a hot gas generator for a plant in Thailand. The scope of supply includes: engineering and manufacturing drawings for the hot gas generator combustion chamber; a combined 45MW oil and coal burner; a primary air fan; a gas electric pilot burner; a flame monitoring device; and an oil valve train with burner management system.
Iraq: Al Shumookh Lucky Investments, a subsidiary of Pakistan’s Lucky Cement, has ordered a power pant from Finland’s Wärtsilä for its Najmat Al-Samawa cement plant. The equipment is scheduled for delivery towards the end of 2019, and the plant is expected to become fully operational during the third quarter of 2020. No price for the order has been disclosed.
The power plant will operate on two Wärtsilä 32 engines running on locally-available heavy fuel oil (HFO) with diesel as a back-up fuel. The engine is designed to operate with reduced fuel and water consumption in hot climates.
BUA Group orders power plant from Wärtsilä
23 April 2019Nigeria: BUA Group has ordered a 48MW power plant from Finland’s Wärtsilä for a new production line at its Sokoto cement plant. The power plant will operate without connection to an electricity grid and it will operate on five Wärtsilä 34DF dual-fuel engines, running primarily on liquified natural gas (LNG) but with the capability to switch to low pour fuel oil (LPFO) if necessary. The site’s two existing power plants operate on heavy fuel oil (HFO).
The Wärtsilä equipment is scheduled for delivery at the end of 2019, and the new plant is expected to become operational in mid-2020. No price for the order has been disclosed.