South Korea/Thailand: Austria’s Unitherm Cemcon has commissioned a MAS kiln burner at a cement plant in South Korea. The order was issued in late 2018 for three MAS burners. The first burner was delivered in February 2019 and the other two in March 2019. In May 2019 Unitherm Cemcon says it supported the commissioning of the first burner.
The scope of supply included two 43MW MAS/4/KO SO type burners for coal and heavy oil and one 87MW MAS/7/KO SO.X type rotary kiln burner for coal, heavy oil and solid secondary fuels. All three burners have been executed with a divisible burner jacket tube. One MAS/7/KO.SO.X is already successfully operating in another line, firing up to 6t/hr of coal and around 10t/hr of solid secondary fuel.
The burner manufacturer has also been awarded a contract to supply a hot gas generator for a plant in Thailand. The scope of supply includes: engineering and manufacturing drawings for the hot gas generator combustion chamber; a combined 45MW oil and coal burner; a primary air fan; a gas electric pilot burner; a flame monitoring device; and an oil valve train with burner management system.