Powtech Technopharm - Your Destination for Processing Technology - 29 - 25.9.2025 Nuremberg, Germany - Learn More
Powtech Technopharm - Your Destination for Processing Technology - 29 - 25.9.2025 Nuremberg, Germany - Learn More
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact

Displaying items by tag: Upgrade

Subscribe to this RSS feed

Aumund to supply equipment for upgrade at LafargeHolcim’s Martres-Tolosane cement plant

23 January 2018

France: Aumund has won an order to supply equipment for an upgrade at LafargeHolcim’s Martres-Tolosane cement plant. Aumund Fördertechnik is supplying a package including belt bucket elevators to feed the 96m tall heat exchanger and the raw meal silo at the plant. Two Aumund BWZ chain bucket elevators will be used to convey raw meal and filter dust, and for silo feed. An Aumund KZB pan conveyor with a vertical lift of 9m will be installed under the clinker cooler.

Seven Aumund Louise-type drag chain conveyors with short centre distances of 13 m and conveying capacities between 7 and 50t/hr will extract filter dust. Two Centrex machines (25 – 250t/hr) will be extracting a mixture of limestone and clay as well as iron ore from silos up to 7m high.

The Euro100m modernisation project at the Martres-Tolosane works is part of LafargeHolcim’s Euro300m investment project in France. Once upgraded, the plant will be equipped to burn alternative fuels, and energy consumption and CO2 emissions will be reduced. Work on the project will start in the final quarter of 2018 and be completed by mid-2020.

Published in Global Cement News
Read more...

Entreprise des Ciments et Dérivés d’El Chellif to open new production line in June 2018

23 January 2018

Algeria: Entreprise des Ciments et Dérivés d’El Chellif (ECDE) plans to open a new 2Mt/yr production line at its plant in Chlef in June 2018. The project covers an area of 15ha and has been presented as a new cement plant, according to the El Watan newspaper. Overall the new line will increase the plants production capacity to 4Mt/yr. The company plans to increase its exports to make a return on its investment.

Published in Global Cement News
Read more...

State minster inaugurates JSW Cement’s Salboni grinding plant

16 January 2018

India: Mamata Banerjee, the chief minister of West Bengal, has inaugurated JSW Cement’s plant at Salboni. The US$125m grinding plant has a production capacity of 2.4Mt/yr, according to the Press Trust of India. It started commercial production at the site in July 2017 with plans to manufacture Portland Slag Cement. The cement producer is already preparing upgrades at the unit including a US$15.6m captive power plant with a capacity of 18MW and a US$47m production capacity increase of 1.2Mt/yr.

Published in Global Cement News
Read more...

Damen shipyard upgrades cement carrier

16 January 2018

Netherlands: The Damen shipyard at Oranjewerf in Amsterdam has upgraded the cement carrying capacity of the Lelie C owned by Cebo Marine. Eight new cement silos, with a capacity of 40m3 each, have been installed on the vessel alongside general maintenance.

The silos were previously fitted on the VOS Symphony prior to it going for scrap. Damen Shiprepair Oranjewerf removed the tanks, refurbished them and then installed them on board the Lelie C. The shipyard also built a silo foundation and fitted it in the vessel’s hold. 80m of stiffeners were welded into place in the double bottom tanks to provide the necessary support. Alongside this, approximately 100m² of grating walkway was fabricated and fitted on the deck to give access to the manifolds on each of the new silos. The supply and discharge and air pipe system for the two existing silos was also refurbished to accommodate the new capacity.

“Two years ago we installed the original tanks from the Ritske, a vessel belonging to the same client, and now we have repeated the process again, this time on a much larger scale. The Lelie C began her life as a general cargo vessel, but now her transformation into a cement carrier is complete,” said Jeen van der Werf, Commercial Manager at Damen Shiprepair Oranjewerf.

Published in Global Cement News
Read more...

New production line starts at Attock Cement’s Hub plant

10 January 2018

Pakistan: A new production line at Attock Cement’s Hub plant in Balochistan has started operation. The line has a cement production capacity of 1.2Mt/yr and it increases the company’s total production capacity to 3Mt/yr. The line was first announced in 2015 at a cost of US$120m. Loesche provided a cement mill for the project in 2017 under contract from the Hefei Cement Research & Design Institute.

Published in Global Cement News
Read more...

Sanghi Cement to expand production capacity to 8.1Mt/yr

05 January 2018

India: Sanghi Cement plans to upgrade its production capacity to 8.1Mt/yr from 4.1Mt/yr. The expansion plan will consist of a 3.3Mt/yr upgrade to its cement plant at Sanghipuram in Gujarat and a 2Mt/yr upgrade to its satellite grinding plant. In addition the cement producer plans to build a 65MW thermal power plant at the main plant. The cost of the project will be US$197m and this will be mostly funded from borrowing.

Published in Global Cement News
Read more...

Sinoma signs waste heat power plant deal with Asia-Africa Business Management in Namibia

03 January 2018

Namibia/China: Sinoma Energy Conservation has signed a contract with China’s Asia-Africa Business Management (AABM) to build a 4.5MW waste heat power plant. The power unit will support a 2500t/day cement production plant that AABM and local company Whale Rock Cement plan to build as a joint venture. The cement plant project was first announced in 2015.

Published in Global Cement News
Read more...
  • Start
  • Prev
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • Next
  • End
Page 107 of 107
Loesche - Innovative Engineering
PrimeTracker - The first conveyor belt tracking assistant with 360° rotation - ScrapeTec
UNITECR Cancun 2025 - JW Marriott Cancun - October 27 - 30, 2025, Cancun Mexico - Register Now



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global GypSupply
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.