Uzbekistan: Construction has begun at Russia’s Eurocement’s 2.0Mt/yr integrated Ankhangarancement plant in the Tashkent region of a facility to house the limestone and clay used in cement production. When the installation is operational, the materials will be relayed from it to the plant’s four wet lines by a conveyor belt and 1400t/hr stacker, whence the mixture is conveyed by 600t/hr-capacity truck to one of the vertical roller mills.
