India: ISGEC Heavy Engineering has received an order from Shree Cement to supply a waste heat recovery (WHR) unit for the integrated 3.8Mt/yr Nawalgarh plant in Rajasthan. The scope of work includes design, manufacture and supply of the system. The supplier says that this will be one of the world’s largest steam-based WHR units by capacity. ISGEC previously supplied two WHR units for Shree Cement’s Raipur plant.
