France: Fives FCB has been awarded an engineering, equipment supply and supervision of works contract for the replacement of a kiln at the Lumbres cement plant. The work covers replacing the downstream shell of the 42.2m kiln, including the tyre. The project is part of the cement producer’s plan to adapt Kiln 5 at the site for the installation of a new clinker cooler.