Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News Ssangyong Cement to install waste heat recovery unit at Donghae plant

Ssangyong Cement to install waste heat recovery unit at Donghae plant

Written by Global Cement staff 05 June 2018
  • Print

South Korea: Ssangyong Cement plans to install a waste heat recovery (WHR) unit at its Donghae plant in Gangwon. The upgrade will be operational by August 2018, according to the Maeil Business Newspaper. The new unit is expected to save the cement producer about 33% of its electricity costs or US$24m/yr.

The investment is the largest that the cement producer’s owner Hahn & Company has approved since it took control. The WHR will work with an energy storage system (ESS) that was installed in March 2018. The ESS saves power consumption by storing energy during the night and then using it during the day. The 22MWhr storage system is power by powered by 2880 batteries. The company said that it would save it at least US$2.4m/yr.

Ssangyong Cement’s Donghae plant is one of the largest in the world with a cement production capacity of 11.2Mt/yr across seven production lines. It occupies an areas of 11.3MM2.

Last modified on 06 June 2018
Published in Global Cement News
Tagged under
  • South Korea
  • Ssangyong Cement Industrial
  • Waste Heat Recovery
  • Upgrade
  • Plant
  • microgrid
  • GCW356

Related items

  • Huaxin Building Materials and Portland Cement Malawi launch US$100m cement plant
  • Alpacem to build plant for use of alternative raw materials in cement at Wietersdorf site
  • Update on Zimbabwe, November 2025
  • Ebonyi governor unveils US$604m budget with plans for new state cement plant
  • Paebbl achieves a total of 2500 hours of operation at CO2-sequestering cementitious materials plant
back to top
Loesche - Innovative Engineering
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« December 2025 »
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.