Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News KHD commissions mill at Siam City Cement’s Saraburi cement plant

KHD commissions mill at Siam City Cement’s Saraburi cement plant

Written by Global Cement staff 29 April 2020
  • Print

Thailand: Germany-based KHD Humboldt Wedag has reported the successful commissioning of a new Comflex grinding line at Siam City Cement’s Plant 1 in Saraburi. The line replaces two ball mill circuits, maintaining a production capacity of 350t/hr with a 40% lower energy consumption. The Comflex comprises a roller press, RPM18–200/180 static coarse material separator, VS620 static fine material separator, LS8600 system fan, HKSK 236/346 and four product separation cyclones. KHD says that Siam City Cement awarded it the engineering, procurement and construction (EPC) contract because of the system’s low specific power consumption of 13.36kWh/t, compared to over 21kWh/t in the previous system.

Last modified on 29 April 2020
Published in Global Cement News
Tagged under
  • Thailand
  • Germany
  • KHD
  • Siam City Cement
  • Plant
  • Grinding mill
  • Upgrade
  • EPC
  • Contract
  • Energy
  • Energy Saving
  • GCW453

Related items

  • Huaxin Building Materials and Portland Cement Malawi launch US$100m cement plant
  • PyroGenesis signs €815,000 contract with European cement producer to test plasma torch for calcination
  • Saman Cement orders second Gebr. Pfeiffer mill for plant expansion
  • Holcim makes three recycling acquisitions to expand circular construction
  • Alpacem to build plant for use of alternative raw materials in cement at Wietersdorf site
back to top
Loesche - Innovative Engineering
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« December 2025 »
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.