Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News Lafarge Zementwerke appoints A TEC for Mannersdorf cement plant alternative fuels Flash Dryer installation

Lafarge Zementwerke appoints A TEC for Mannersdorf cement plant alternative fuels Flash Dryer installation

Written by Global Cement staff 24 November 2020
  • Print

Austria: Loesche subsidiary A TEC has won a contract for the supply and installation of a Flash Dryer for alternative fuels (AFs) in the kiln line of Lafarge Zementwerke's 1.1Mt/yr Mannersdorf cement plant in Lower Austria. The supplier said that it will complete the project in early 2021.

The company said, “Reaching high thermal substitution rates (TSR) requires firing of alternative fuels at the kiln burner. To reach a stable sintering zone for the required clinker quality a high fuel quality (high LCV, small particle size) is needed, otherwise the clinker quality may suffer or the TSR can be limited. With the A TEC Flash Dryer various waste heat sources can be used (clinker cooler flue gas, bypass gas, preheater gas, etc.). The material is dosed to the hot gas flow in the flash dryer and transported with this gas flow, while the moisture is evaporated, to a cyclone and a subsequent filter where the fuel is separated from the gas flow and on-line fed to a kiln burner or a satellite burner. In addition to the drying the lifting effect of the gas can separate 3D impurities which contributes in a further increase of the fuel quality.”

Last modified on 25 November 2020
Published in Global Cement News
Tagged under
  • Austria
  • LafargeHolcim
  • A TEC
  • Plant
  • Upgrade
  • dryer
  • Alternative Fuels
  • Lafarge Zementwerke
  • GCW483

Related items

  • Boral secures US$16.6m grant for alternative fuels project at Berrima Cement Works
  • My Home Cement orders Gebr. Pfeiffer mill for slag cement plant
  • Sublime Systems pauses Holyoke project after federal funding setback
  • Emissions controls and more in South Korea, December 2025
  • Heidelberg Cement India to build cement plant at Sant Singaji power plant
back to top
Loesche - Innovative Engineering
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« December 2025 »
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.