UK: Heidelberg Materials subsidiary Hanson has awarded a contract to Mitsubishi Heavy Industries subsidiary MHI Engineering for installation of a planned 800,000t/yr carbon capture system at its Padeswood cement plant in Flintshire. The producer plans to store its captured CO2 in exhausted Irish Sea natural gas fields. MHI Engineering will carry out a pre-front-end engineering design study using its Advanced KM CDR solvent-based process. The supplier developed the process jointly with fellow Japan-based company Kansai Electric Power.
The project will be MHI Engineering's third of its kind at a cement plant, following similar commissions with Lehigh Cement in Canada and Tokuyama Cement in Canada.