Thailand: Switzerland-based Maerz has commissioned a new 150t/day lime kiln at Bangkok CaO’s plant at Saraburi. The kiln is the third Parallel Flow Regenerative (PFR) unit that Maerz has supplied to the site following previous installations in 1996 and 2008. All the kilns at the plant use waste oil as a fuel.
