Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News Vinh Tan 1 coal-fired power plant supplies 811,000t of slag and ash to cement plants in first nine months of 2023

Vinh Tan 1 coal-fired power plant supplies 811,000t of slag and ash to cement plants in first nine months of 2023

Written by Global Cement staff 27 October 2023
  • Print

Vietnam: Cement producers received 811,000t of boiler slag and fly ash from the Vinh Tan 1 coal-fired power plant in Binh Thuan during the first nine months of 2023. This corresponds to 74% of the volume of the by-products generated at the plant during the period. Việt Nam News has reported that the nearby Vinh Tan 4 coal-fired power plant also ‘almost entirely’ avoided waste in the same way. The Vinh Tan 1 coal-fired power plant ended the period with 4.3Mt of ash and slag in stockpiles, while the neighbouring Vinh Tan 2 Thermal Power Plant had 7Mt.

The provincial government of Binh Thuan Province has lobbied the Ministry of Construction to review and adjust current requirements around HDPE liner use, water quality testing and radiation safety in order to facilitate the use of boiler slag and fly ash in cement and other construction products.

Last modified on 01 November 2023
Published in Global Cement News
Tagged under
  • Vietnam
  • Fly Ash
  • industrial waste
  • circular economy
  • stockpiles
  • Sustainability
  • Alternative raw materials
  • supplementary cementitious materials
  • GCW632

Related items

  • GCCA reports 25% CO₂ intensity reduction since 1990
  • EBRD decarbonisation loan for Çimsa
  • The price of cement sector decarbonisation
  • Vietnam’s cement and clinker exports rise by 28% in October 2025
  • South Korea to mandate disclosure of waste materials on cement packaging
back to top
We Move Industries - Heko Group - Conveyor Solutions
“Loesche
SR-MAX2500 Primary Shredder for MSW - Fornnax
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« November 2025 »
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global GypSupply
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.