Australia: Boral will receive US$15.4m in government funding for a kiln feed optimisation project at its Berrima Cement Works, with CO₂ emissions expected to reduce by up to 100,000t/yr, based on predicted production rates. The Powering the Regions grant will support the producer’s installation of a new specialised grinding circuit and supporting infrastructure, which will raise the use of alternative raw materials in kiln feed to 23% from 9%, lowering the amount of limestone used.
Boral will use steel manufacturing by-products and industrial waste, including granulated blast furnace slag, steel slag, cement fibre board, fly ash and recycled fine concrete aggregates. The project will be operational in 2028.
The head of innovation and sustainability at Boral, Ali Nezhad, said “In terms of the resulting emissions intensity of the manufactured clinker, the project will result in up to 11% reduction in clinker emission intensity, 9% attributable to a reduction in calcination emissions and 2% attributable to thermal efficiency gains.”