India: Nuvoco Vistas has launched Duraguard Microfibre Cement, a fibre reinforced cement. The cement’s clinker is 48-52% tricalcium silicate, with low tricalcium aluminate, and contains electrostatically precipitated dry fly ash. The producer says that it offers enhanced bonding, crack resistance, strength and durability and reduced permeability, as well as a smoother surface finish, compared with ordinary Portland cement (OPC). Nuvoco Vistas first applied for a patent for the product in mid-2018.

Managing director Jayakumar Krishnaswamy said "We prioritise innovation. Our Construction Development and Innovation Centre (CDIC) is dedicated to creating sustainable and innovative products that meet the highest global standards. The awarded patent validates our unwavering commitment to innovation and keeps us in the forefront of pioneering advances in the cement industry, delivering exceptional quality and responsible business practices."

India: Adani Group subsidiary ACC has started commercial clinker production from the kiln of its new Ametha cement plant in Madhya Pradesh’s Katni District. BQ Prime News has reported that the kiln line has a clinker capacity of 3.3Mt/yr. It is capable of co-processing up to 15% alternative fuel (AF). The plant is also equipped with a 1Mt/yr grinding unit and a 16.3MW waste heat recovery (WHR) plant.

The Ametha cement plant raises ACC’s installed cement and clinker capacity by 9.8% to 37Mt/yr.

Nigeria: Cross-industry body Manufacturers Association of Nigeria (MAN) recorded a 30% year-on-year drop in all-Nigeria cement sales during the first half of 2023. MAN attributed the decline to the government’s replacement of the naira with a new central bank digital currency. The Punch newspaper has reported that this ‘wiped out’ some cash-based businesses, including cement retailers. Point of sale charges also increased costs along the supply chain. The association said that the impacts of the policy led manufacturers in some sectors to halt their operations.

Jamaica: Caribbean Cement plans to launch an upgrade to expand its Rockfort cement plant’s capacity by 30% to 1.3Mt/yr in October 2023. The producer says that the expansion will cost US$40m and that the new capacity will come online in early 2025. The work will include enlargements of multiple kiln sections and the installation of a new coal dosing system, clinker cooler and clinker transport system.

More Articles ...

Subcategories