Sweden: Norway-based Geminor received a batch of refuse-derived fuel (RDF) produced at its Braunsbedra plant in Saxony-Anhalt, Germany for use at Scandinavian cement plants on 23 April 2020. The shipment was Europe’s first international shipment of RDF by rail, without the use of trucks. Geminor plans for the 110t delivery to be the first of many on the 50,000t-capacity line. Geminor CEO Kjetil Vikingstad said, “Since transport by ship is only effective within a radius of 200km from a port, central Germany becomes a natural starting point for
transport by train. This is the beginning of extensive waste transport by train in
Europe.”
Cemex plant emits cloud of dust
US: A cloud of dust from Cemex’s 3.3Mt/yr Victorville, California plant caused the fire brigade to be called to the site at 17:00 on 24 April 2020. Victor Valley News has reported that what onlookers believed to be smoke was indeed escaped dust from silo refilling. Locals reported that dust frequently covers their cars.
Hanson team makes sign to thank National Health Service
UK: A team of Hanson employees has produced a sign from recycled materials from around the company’s 1.0Mt/yr Purfleet slag cement grinding plant. The 6m-long luminous sign, which reads ‘NHS Thank You,’ has been installed at the plant on the mill three tower overlooking the QE2 Dartford Crossing. Hanson Purfleet plant manager Warren Scott said, “The team wanted to show their appreciation for the NHS and key workers and came up with and executed this idea in their own time.”
Hanson has kept ‘a number of key sites’ open through the coronavirus outbreak in order ‘to supply key national infrastructure projects or to provide maintenance materials to critical sectors.’ Hanson has furloughed part of its staff under the government’s Coronavirus Job Retention Scheme.
Vietnamese contract for FCT
Vietnam: US-based FCT Combustion has published details of a new contract with Vietnam National Coal and Minerals Industry Holding Group (Vinacomin) for the supply of an FCT Turbo-Jet burner to Vinacomin’s 0.6Mt/yr La Hiên plant in Thái Nguyên province. The upgrade aims to enable the use of lower calorific coal while maintaining clinker strength and specific fuel consumption, in order to reduce fuel costs.
FCT Combustion previously provided burners at Vinacomin’s 0.8Mt/yr Quan Trieu cement plant in 2019 and 1.5Mt/yr Quang Son cement plant in 2020, both in Thái Nguyên province.


