Cambodia: Siam Cement Group’s (SCG) sales in Cambodia grew by 15% year-on-year to US$396m in 2018 due to higher sales of cement. The Thai company operates six subsidiaries in the country, including Kampot Cement, according to the Phnom Penh Post newspaper. Chiv Sivpheng, general manager of the Cambodia Constructors Association, said that demand for construction materials had been increasing annually as the population increases and urbanisation intensifies.
Anjani Portland Cement’s profit falls as fuels costs grow
India: Anjani Portland Cement’s revenue grew by 16% year-on-year to US$44.5m in the nine months to 31 December 2018 from US$39.1m in the same period in 2017. However, its expenses rose by 20% to US$42.1m from US$35m due to fuel and logistic cost increases. Its profit before tax fell by 31% to US$2.54m from US$3.68m.
South Kyrgyz Cement accused of selling cement for export cheaper than local prices
Kyrgyzstan: Shukhrat Sabirov, the head of the State Antimonopoly agency, has reported to parliament that South Kyrgyz Cement was fined for selling exported cement at a price lower than it sells cement locally. The official made the comment in response to questions from a member of parliament, according to Kyrgyzstan Newsline.
New orders for Intercem in Germany and Russia
Germany/Russia: Intercem has been awarded new orders in Germany and Russia. In Russia it will supply a high-efficiency separator ICS 143, as well as the associated plant aggregates to a new cement plant. The high-efficiency separator, an in-house development manufactured in the company workshop, has a capacity of 115t/hr at 3000cm2/g acc. to Blaine and a total output of 258t/hr. The volume flow classifying air is 143.000m3/hr. The scope of supply also includes the engineering for the complete grinding plant as well as the supervision of the assembly and the commissioning of the components included in the delivery.
In Germany it will supply silos for Zementwek Lübeck’s grinding plant. The order includes a silo unit consisting of four steel silos with a capacity of 1200m3 each. In addition, the bulk loading and the complex cement conveying via air slides and bucket elevators leading over the complete area of the plant are part of the scope of supply. The scope of supply also includes the engineering and associated plant components, such as support structure, catwalks, filters, bucket elevators, return lines, electrical equipment, as well as building application and dispatch automation. Completion is scheduled for the third quarter of 2019.
The German engineering company has also won a contract to optimise a secondary fuel dosing system at a German cement plant.


