Thailand: Siam City Cement has closed the production lines at its Plant 1 integrated cement plant in Saraburi province due to a lack of demand resulting from the coronavirus outbreak. In a statement the company said that, “The aftermath of the COVID-19 pandemic is seriously affecting the overall economic system and has already caused the global business and industrial sectors. The impact on us has been the drastic decline in demand both from domestic and regional markets.” It added that the closure was not expected to have an adverse impact on its operations. It is offering a ‘Mutual Separation Plan’ to affected workers in accordance with and beyond local labour regulations.
Normal production will continue at its Plant 2 and Plant 3 sites. In its 2019 annual report the cement producer said that it operated three cement plants in Kang Koi District, Saraburi Province with a total of six kilns and a combined clinker capacity of 13Mt/yr. However, only five kilns were in operation at this time with a combined production of 12Mt/yr.
This news story has been updated following clarification from Insee Cement.