Belgium: The low-emissions intensity lime and cement (LEILAC) consortium has published the results of its LEILAC-1 carbon capture and storage (CCS) study at HeidelbergCement’s Lixhe cement plant in Visé. The study found the cost of CCS to be Euro14 – 24/t of CO2 captured. It found that full-chain CO2 mitigation projects incur costs are Euro39 – 80/t, depending on transport and storage selections.
EU Emissions Trading Scheme (ETS) credits currently cost Euro62/t.