Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News IKN provides detail on upgrade to HeidelbergCement’s Burglengenfeld plant

IKN provides detail on upgrade to HeidelbergCement’s Burglengenfeld plant

Written by Global Cement staff 26 June 2018
  • Print

Germany: IKN has revealed that first clinker was created on schedule at HeidelbergCement’s Burglengenfeld cement plant in April 2018 following an upgrade to one its kiln lines.

IKN was awarded a contract for engineering, supply and installation to upgrade the pyro-processing line to 4000t/day, from raw meal feeding to clinker discharge. The contract included integration engineering, supply and installation of add-on components for the raw meal grinding plant. The new production line comprises a two-string, five-stage preheater tower with inline calciner and Fire Bed Combustor for coarse refuse-derived fuel (RDF). IKN says that its most modern preheater and calciner design ensures minimum pressure drop at maximum performance and high efficiency. The kiln line has been designed for maximum use of a broad range of alternative fuels.

Last modified on 26 June 2018
Published in Global Cement News
Tagged under
  • Germany
  • IKN
  • Upgrade
  • HeidelbergCement
  • Plant
  • GCW359

Related items

  • Ebonyi governor unveils US$604m budget with plans for new state cement plant
  • Paebbl achieves a total of 2500 hours of operation at CO2-sequestering cementitious materials plant
  • Mozambique to build two new cement plants with Chinese investment
  • BirlaNu to build fibre cement board plant in Andhra Pradesh
  • Cement product launch roundup, November 2025
back to top
We Move Industries - Heko Group - Conveyor Solutions
“Loesche
SR-MAX2500 Primary Shredder for MSW - Fornnax
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« November 2025 »
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global GypSupply
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.