29 November 2019
Lehigh Cement partners with International CCS Knowledge Centre for Edmonton plant CCS installation 29 November 2019
Canada: HeidelbergCement’s Canadian subsidiary Lehigh Cement is trialling the cement industry’s first full carbon capture and storage (CCS) installation at its 1.4Mt/yr integrated Edmonton plant in Alberta in partnership with Canada’s International CCS Knowledge Centre. The installation will have a CO2 capture rate of between 90% and 95% and receive an investment of US$1.4m from the state government body Emissions Reduction Alberta (ERA). “We are part of HeidelbergCement’s vision of CO2-neutral concrete by 2050 and are committed to leading global change for CCS in our industry,” said Jeorg Nixdorf, Lehigh Hanson Canada regional president.
HeidelbergCement downgrades stake in Ciments du Maroc to 51% 29 November 2019
Morocco: HeidelbergCement has sold 3.6% of its 54.6% stake in Ciments du Maroc’s share capital. HeidelbergCement chairman Bernd Scheifele expressed the company’s commitment to retaining its majority stake in the total 5.6Mt/yr-capacity cement producer. Scheifele explained that the decision was ‘aimed at generating cash to speed up deleveraging,’ and that it was ‘well on track’ to reach its Euro1.5bn disposal target by the end of 2020.
HeidelbergCement subsidiary TBG BH commissions concrete plant 29 November 2019
Bosnia Herzegovina: HeidelbergCement’s Bosnian concrete subsidiary TBG BH has entered into production at its new concrete plant in the southern city of Mostar, bringing its number of plants in active production to seven. Ehlimana Šehmehmedović, TBG BH director, said: “The opening of a concrete production facility in Mostar is part of our strategy to strengthen the supply of quality products to Mostar and Herzegovina.”
Votorantim Cimentos wins two sustainability awards 29 November 2019
Spain: The European Union of Aggregates Producers has granted two Sustainable Development Awards to Brazil’s Votorantim Cimentos for its El Toril quarry restoration plan and cave conservation plan for the Cova Eirós mine, which provided raw materials for clinker produciton at its 0.7Mt/yr integrated Oural plant. Votorantim Cimentos has partnered with the University of Santiago de Compostela to facilitate archaeological study of Cova Eirós, where 50,000-year-old findings have been made. Meanwhile at El Toril, the pit will be filled, levelled and enhanced for fertility so that it may resume its previous use as arable land.