Germany: Cool Planet Technologies and Hereon have signed a memorandum of understanding with Holcim Deutschland to deliver a carbon capture system for a carbon capture and storage (CCS) trial at the producer’s Höver cement plant in Lower Saxony. Cool Planet Technologies will install their system, which is based on Hereon’s PolyActive membrane technology. The system will have a capture capacity of 5600t/yr and operate from early 2022 to early-mid-2023. If successful, two subsequent expansions will increase the system’s capacity to 170,000t/yr, commencing operation in 2024, and 1.3Mt/yr, commencing in 2026.
The suppliers say that their membrane-based capture system is capable of reducing the energy intensity and eliminating the need for other chemical inputs in CCS.