Germany: Rohrdorfer Zement has fired up a pilot clay tempering unit at its Rohrdorf cement plant in Bavaria. The project has received Euro8.65m in funding from the German Federal Ministry for Economic Affairs and Climate Action and the EU. It is one of a number of industrial projects under the EU’s Euro800bn NextGenerationEU post-Covid-19 economic recovery instrument. Sources of heat for the pilot unit at the Rohrdorf cement plant include waste heat from the plant’s clinker line. If the pilot succeeds, the introduction of tempered clay into cement production at the site will follow. This will entail the construction of an on-site full-scale clay tempering plant. Rohrdorfer Zement says that this would reduce the plant’s CO2 emissions by 16 – 18%, or by 30% if it achieves carbon neutral clay tempering through the use of green hydrogen.
Rohrdorfer’s dedicated Net Zero Emissions Labs team is working to turn the Rohrdorf cement plant carbon neutral by 2038. Other initiatives include the installation of carbon capture systems at the Rohrdorf plant and another in Austria, and participation in the H2-Reallabor Burghausen hydrogen partnership.
Regarding the latest pilot, Rohrdorf Net Zero Emissions Labs project leader Helmut Leibinger said “As a cement component, tempered clays make a significant contribution to CO2 mitigation. With the pilot project of process-integrated tempered clay, we are taking not just a step in our decarbonisation roadmap, but a leap.”