Saudi Arabia: Yamama Cement has commissioned its second cement plant, with 20,000t/day in capacity across two clinker lines. The producer invested US$1.25bn in the plant's construction, which was carried out by Germany-based ThyssenKrupp. The facility is equipped with seven raw materials crushers, a 3.7km-long limestone conveyor belt, 110,000t of storage capacity, four Quadropol roller mills, two Dopol preheater towers, two Polro rotary kilns, two Polytrack clinker coolers, three 100,000t clinker silos, four Polycom high-pressure roller mills, six 22,590t and 25,000t cement silos and 22,000m³
in water storage basins. The new plant is situated in the eastern Arabian Desert, 80km from Riyadh.
Yamama Cement also operates the 6.4Mt/yr Al Karj Cement plant, 70km from Riyadh.